Port Moody (City) Regional District: Metro Vancouver
Community Contact
100 Newport Drive
Port Moody, BC V3H 5C3
604-469-4500
climateaction@portmoody.ca
Community Info
Economic Region : Mainland/Southwest
Regional District: Metro Vancouver
Area Association: LMLGA
Climate Zone : Zone 4
Utilities Data
Gas Provider: Fortis
Electricity Provider: BC Hydro
Electrical Reliability Performance Data
2020 | 2021 | 2022 | |
---|---|---|---|
Average customer interruption (hours) | 1.05 | 2.11 | 3.25 |
Average number of interruptions per customer: | 1.4 | 1.9 | 0.94 |
Available LGCAP Reports
Building Codes and other Regulations
Action Name | Type | Sector | Big Move | Category | Department | Commitment | Yr Planned | Yr Actual | Link | Description | Connected to Plan(s) | Plan Doc | Plan Actions | Community | Verified? |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
EV-Ready Building Requirements | Regulation | Transportation | Electric Vehicles | EV-Ready Building Requirements | In Effect | February 12, 2019 | View Action Doc |
The City of Port Moody’s Zoning Bylaw includes requirements for electric vehicle charging infrastructure in the city. For new residential units, all parking spaces must include an energized outlet capable of providing Level 2 charging for an electric vehicle, excluding: For all commercial parking, 20% of the parking spaces must include an energized outlet capable of providing Level 2 charging for an electric vehicle, excluding: |
Port Moody (City) | ||||||
Part 9 New Construction | Regulation | Buildings | New Buildings | Building Codes | Expired | View Action Doc |
Energy Step 4 beginning January 1, 2024. |
Port Moody (City) | |||||||
Part 3 New Construction | Regulation | Buildings | New Buildings | Building Codes | Expired | View Action Doc |
Group C: residential – greater than six stories or non-combustible construction (excluding hotels and motels): Step 3, OR: Step 2 (BCBC) with a low carbon energy system Group C: residential – six stories or fewer with combustible construction (excluding hotels and motels): Group D: businesses and personal services: BCBC |
Port Moody (City) | |||||||
Part 9 New Construction | Regulation | Buildings | New Buildings | Building Codes | In Effect | January 1, 2025 | View Action Doc |
Energy Step 4 + Zero Carbon Zero (EL-4) beginning January 01, 2025. |
Port Moody (City) | ||||||
Part 9 New Construction | Regulation | Buildings | New Buildings | Building Codes | Adopted | January 1, 2027 | View Action Doc |
Energy Step 5 + Zero Carbon Zero (EL-4) beginning January 01, 2027. |
Port Moody (City) | ||||||
Part 3 New Construction | Regulation | Buildings | New Buildings | Building Codes | Expired | January 1, 2024 | View Action Doc |
Group C: Residential Occupancies, six storeys or less: Energy Step 3, OR: Energy Step 2 with a Low Carbon Energy System (EL-2) beginning January 1, 2024 Group C: Hotels and Motels; Group D Offices (Businesses and Personal Services); Other Group D and E (Mercantile) Occupancies: Energy Step 2 (BCBC) |
Port Moody (City) | ||||||
Part 3 New Construction | Regulation | Buildings | New Buildings | Building Codes | In Effect | January 1, 2025 | View Action Doc |
Group C: Residential Occupancies, six storeys or less: Energy Step 3 + Zero Carbon Zero (EL-4) beginning January 01, 2025. Group D Offices (Businesses and Personal Services): Energy Step 2 (BCBC) + Zero Carbon Zero (EL-4) beginning January 01, 2025. |
Port Moody (City) | ||||||
Part 3 New Construction | Regulation | Buildings | New Buildings | Building Codes | Adopted | January 1, 2027 | View Action Doc |
Group C: Residential Occupancies, six storeys or less: Energy Step 4 + Zero Carbon Zero (EL-4) beginning January 01, 2027. Group D Offices (Businesses and Personal Services): Energy Step 3 + Zero Carbon Zero (EL-4) beginning January 01, 2027. |
Port Moody (City) |
Actions
Action Name | Type | Sector | Big Move | Category | Department | Commitment | Yr Planned | Yr Actual | Description | Connected to Plan(s) | Plan Doc | Plan Actions | Community | Verified? |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Green buildings policy | Policies | Leadership | Leadership | Corporate Buildings | Planned |
Develop and implement a green buildings policy for the construction and renovation of City-owned facilities |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | ||||
Green buildings rezoning policy | Policies | Buildings | New Buildings | Planned |
Develop and implement a green buildings rezoning policy for development applications |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | |||||
Zero-emissions existing building plan | Policies | Buildings | Existing Buildings | Planned |
Develop a resilient, zero-emissions plan for all existing buildings that includes addressing indoor air quality, and climate risks where possible. |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | |||||
Zero-emissions new building plan | Plans and Targets | Buildings | New Buildings | Planned |
Develop a resilient, zero-emissions plan for all new buildings that includes addressing indoor air quality and climate risks where possible. |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | |||||
Zero Emissions Education & Outreach | Programs | Transportation | Shift Beyond the Car | Training, Outreach and Engagement | Planned |
Create public education campaigns to increase awareness of zero-emission transportation, including active options and zero-emission vehicle options. |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | ||||
Zero-Emissions New Building Plan | Policies | Buildings | New Buildings | Active Transportation Plan | Planned |
Develop a resilient, zero-emissions plan for all new buildings that includes addressing indoor air quality and climate risks where possible. |
Climate Ready Homes and Buildings Plan | Plan Doc | Connected | Port Moody (City) | ||||
Curbside Organics Collection Programs | Programs | Waste | Waste | Curbside Organics Collection | In Effect |
Since 2004, we have collected 32,000 tonnes of recyclables through our curbside waste collection service. In 2010, the City expanded its green waste collection program, previously limited to yard trimmings, to include food scraps and other kitchen waste. Since then, 26,725 tonnes of green waste have been collected and diverted from the landfill. |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | ||||
Step Code Implementation Plan | Policies | Buildings | New Buildings | Energy Step Code | Planned |
Develop a strategy and adopt the BC Energy Step Code in advance of the provincial timeline. |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | ||||
Expanded EV Charging | Projects | Transportation | Electric Vehicles | EV Charging Infrastructure | In Effect |
We have installed electric vehicle charging stations for public use at seven locations that can accommodate a total of 13 vehicles. There are six Level 2 charging stations and one DC Fast Charging station. |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | ||||
Expanded EV Charging | Policies | Transportation | Electric Vehicles | EV-Ready Building Requirements | In Effect |
We require electric vehicle charging infrastructure in all new residential and commercial developments. All parking spaces for new dwelling units, all accessible parking spaces, and 20% of commercial parking spaces must include an energized outlet capable of providing Level 2 charging for electric vehicles. |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | ||||
Green Buildlings Policy | Plans and Targets | Buildings | New Buildings | Other | Planned |
Develop and implement a green buildings rezoning policy for development applications |
Climate Ready Homes and Buildings Plan | Plan Doc | Connected | Port Moody (City) | ||||
Green Fleet Policy | Policies | Leadership | Leadership | Corporate Mobility | In Effect |
Since 2012 the City has been adhering to the Green Fleet Policy as commitment to environmental sustainability in its corporate operations. The purpose of this policy is to provide guidance to City staff on purchasing and managing the City’s fleet in order to minimize greenhouse gas emissions and other detrimental environmental impacts. |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | ||||
Transportation Plans & Strategies | Policies | Transportation | Shift Beyond the Car | Strategy, Plan or Targets | In Effect |
Accelerate and fund implementation of the Master Transportation Plan projects to reduce GHG emissions by 2030, including accelerating alternative transportation goals, and initiatives focused on transit, transit-oriented development, and paths and trails. |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | ||||
Parking Policies | Policies | Transportation | Shift Beyond the Car | Parking Policies | Planned |
Identify and implement policies to support the highest and best use of City-owned parking and curb space. |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | ||||
Ride Hailing Licensing | Policies | Transportation | Shift Beyond the Car | Ride Sharing and/or Ride Hailing | Planned |
Develop business license requirements and regulations through street and traffic bylaws that support low-emission ride-hailing services and autonomous vehicles |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | ||||
Zero Emissions Mobility Strategy | Plans and Targets | Transportation | Electric Vehicles | Strategy, Plan or Targets | Planned |
Develop a community zero-emissions mobility strategy. |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | ||||
Zero Waste Strategy | Plans and Targets | Waste | Waste | Strategy, Plan or Targets | Planned |
Develop a zero-waste strategy for City facilities and City events. |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | ||||
Zero Waste Strategy | Plans and Targets | Waste | Waste | Strategy, Plan or Targets | Planned |
Develop a community and commercial focused zero waste strategy. |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | ||||
Zero Emissions Plans Adoption | Plans and Targets | Buildings | Existing Buildings |
By 2030, all new and replacement heating and hot water systems are zero emissions |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | ||||||
Zero Emissions Plans Adoption | Plans and Targets | Buildings | Existing Buildings |
By 2030, all oil and propane heating and hot water systems are replaced with zero emission systems |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | ||||||
Zero Emissions Plans Adoption | Plans and Targets | Buildings | Existing Buildings |
By 2050, all buildings have replaced heating and hot water with zero emission systems |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | ||||||
Zero-Emissions Existing Building Plan | Policies | Buildings | Existing Buildings | Strategy, Plan or Targets | Planned |
Develop a resilient, zero-emissions plan for all existing buildings that includes addressing indoor air quality, and climate risks where possible. |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | ||||
Energy Efficiency | Policies | Buildings | Existing Buildings | Supportive Low Carbon Building Policies | In Effect |
We are improving the energy efficiency of the Civic Centre, Recreation Complex, and Arts Centre by making significant repairs to the building envelopes. Higher-performing building envelopes (with improvements to insulation, windows, and doors) prevent heated or cooled air from leaking out – this reduces the amount of energy needed to make indoor spaces comfortable. |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | ||||
Green Buildings Policy | Policies | Buildings | Existing Buildings | Supportive Low Carbon Building Policies | In Effect |
New exemptions are included in the Zoning Bylaw to encourage green building features. Floor area exemptions support passive design (e.g. thicker walls, improved insulation, and natural ventilation). Height, siting, and floor area exemptions support sustainable energy systems that provide higher building energy performance. |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | ||||
Green Buildings Policy | Policies | Buildings | Existing Buildings | Supportive Low Carbon Building Policies | Planned |
Develop and implement a green buildings policy for the construction and renovation of City-owned facilities |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | ||||
Include Performance Measures in City’s Sustainability Report Card | Policies | Buildings | Existing Buildings | Supportive Low Carbon Building Policies | In Effect |
Revise the City’s Sustainability Report Card to include performance measures to reduce operational and embodied GHG emissions and climate risks. |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | ||||
Zero Emissions Education & Outreach | Programs | Transportation | Shift Beyond the Car | Training, Outreach and Engagement | Planned |
Create public education campaigns to increase awareness of zero-emission transportation, including active options and zero-emission vehicle options. |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | ||||
Zero Emissions Education & Outreach | Programs | Transportation | Shift Beyond the Car | Advocacy | Planned |
Advocate for significant policy changes that reduce emissions including the Province (Right-to-Charge legislation), Metro Vancouver (tolls, congestion charging, TDM), TransLink (zero emission fleet), ICBC (alternative insurance), car-sharing services and the Port of Vancouver. |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | ||||
Waste Education & Outreach Programs | Programs | Waste | Waste | Training, Outreach and Engagement | Planned |
Work with partner organizations on public education campaigns to increase awareness of waste reduction tools, programs and information. |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | ||||
Organization-Wide | Policies | Leadership | Leadership | Other | Planning andDevelopment | Planned |
Develop policy and procedures to embed climate mitigation and adaptation considerations throughout day-to-day City business. |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | |||
Organization-Wide | Policies | Leadership | Leadership | Other | Planning andDevelopment | Planned |
Review existing City regulations and initiatives with a climate lens |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | |||
Organization-Wide | Policies | Leadership | Leadership | Budgeting and Funding | Finance and Technology | Planned |
Integrate climate budgets in the municipal budget process. |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | |||
Natural Environment | Policies | Adaptation | Adaptation | Green/Blue Infrastructure | Environmentand Parks | Planned |
Develop climate resilient landscaping strategies for public lands |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | |||
Natural Environment | Policies | Adaptation | Adaptation | Green/Blue Infrastructure | EngineeringandOperations | Planned |
Develop a green infrastructure policy and program |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | |||
Natural Environment | Policies | Adaptation | Adaptation | Green/Blue Infrastructure | Environmentand Parks | In Effect |
Implement strategies to protect, restore, and connect ESAs city-wide. |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | |||
Natural Environment | Policies | Adaptation | Adaptation | Other | Environmentand Parks | Planned |
Develop and regularly update the invasive species management program |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | |||
Natural Environment | Policies | Adaptation | Adaptation | Green/Blue Infrastructure | Environmentand Parks | In Effect |
Develop an urban forest management strategy |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | |||
Natural Environment | Policies | Adaptation | Adaptation | Training, Outreach and Engagement | Environmentand Parks | Planned |
Continue to increase public awareness and engagement with environmental programs |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | |||
Natural Environment | Policies | Adaptation | Adaptation | Other | Environmentand Parks | Planned |
Continue to partner with local stewardship groups |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | |||
Natural Environment | Policies | Adaptation | Adaptation | Green/Blue Infrastructure | Finance andTechnology | Planned |
Develop and implement a natural assets management plan with consideration of a carbon budget. |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | |||
Infrastructure | Policies | Leadership | Leadership | Other | Engineering andOperations | Planned |
Incorporate climate change considerations into the City’s water distribution and wastewater collections systems |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | |||
Infrastructure | Policies | Leadership | Leadership | Other | Engineering andOperations | In Effect |
Incorporate climate change considerations into integrated stormwater management process and planning. |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | |||
Infrastructure | Policies | Leadership | Leadership | Other | Engineering andOperations | Planned |
Implement effective utility management principles for the management of the water distribution and wastewater systems (e.g. municipal metering of sanitary, effective utility management principles. |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | |||
Infrastructure | Policies | Adaptation | Adaptation | Other | Engineering andOperations | Planned |
Incorporate climate risks into asset management planning. |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | |||
Infrastructure | Policies | Leadership | Leadership | Other | Engineering andOperations | Planned |
Work toward water usage metering on all properties through a phased program. |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | |||
Infrastructure | Policies | Adaptation | Adaptation | Training, Outreach and Engagement | Planning andDevelopment | Planned |
Enhance public engagement and education on water conservation and flood preparedness |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | |||
Emergency Response and Human Health | Policies | Adaptation | Adaptation | Other | Fire Rescue | Planned |
Ensure City departments are adequately staffed and equipped to respond to extreme weather events. |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | |||
Emergency Response and Human Health | Policies | Adaptation | Adaptation | Other | Finance andTechnology | Planned |
Access grants to support emergency preparedness and ensure City financial reserves are consistently available in the case of extreme events. |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | |||
Emergency Response and Human Health | Policies | Adaptation | Adaptation | Other | CommunityServices,Environmentand Parks | Planned |
Identify and prepare public properties to act as emergency support centres as needed. |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | |||
Emergency Response and Human Health | Policies | Adaptation | Adaptation | Strategy, Plan or Targets | Fire Rescue | Planned |
Develop an extreme weather response plan with a focus on supporting the most vulnerable populations. |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | |||
Emergency Response and Human Health | Policies | Adaptation | Adaptation | Training, Outreach and Engagement | Planning and Development | In Effect |
Continue to inform and facilitate community education about preparedness across hazards, and build stronger connections with community associations and businesses with the aim of improved preparedness for extreme weather events. |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | |||
Emergency Response and Human Health | Policies | Adaptation | Adaptation | Training, Outreach and Engagement | Fire Rescue | Planned |
Build partnerships and collaborate on connecting those most vulnerable to the impacts of climate change to available services (e.g. access to inclement weather shelters). |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | |||
Land Use and Growth Management | Policies | Land Use | Land Use | Compact, Complete Communities | Planning andDevelopment | In Effect |
Encourage density and mixed-use neighborhoods around transportation hubs through the Official Community Plan and development applications. |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | |||
Land Use and Growth Management | Policies | Land Use | Land Use | Compact, Complete Communities | Planning and Development | Planned |
Create and implement a policy to encourage development of complete, compact communities that enable the residents’ easy access to daily needs. |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | |||
Land Use and Growth Management | Policies | Land Use | Land Use | Other | Planning and Development | Planned |
Require developers to include comprehensive transportation demand management (TDM) strategies in proposals for new large development projects. |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | |||
Land Use and Growth Management | Policies | Land Use | Land Use | Other | Planning andDevelopment | In Effect |
Apply a climate risk lens to a review of existing hazard mapping and associated Development Permit Areas. |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | |||
Land Use and Growth Management | Policies | Land Use | Land Use | Park Land | Environmentand Parks | Planned |
Target park acquisition on an ongoing basis to support the Parks and Recreation Master Plan recommendations by adding a climate lens. |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | |||
Land Use and Growth Management | Policies | Land Use | Land Use | Other | Environmentand Parks | Planned |
Improve standards for erosion and sediment control for new developments and City projects. |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | |||
Land Use and Growth Management | Policies | Land Use | Land Use | Strategy, Plan or Targets | Planning andDevelopment | Planned |
Develop a sea level rise strategy to assess and respond to coastal flooding, coastal squeeze, shoreline erosion and inundation. |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | |||
Land Use and Growth Management | Policies | Land Use | Land Use | Training, Outreach and Engagement | Planning andDevelopment | In Effect |
Continue to work with the Fraser Basin Council on the Lower Mainland Flood Management Strategy and public education on flood risk. |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | |||
Buildings | Policies | Leadership | Leadership | Corporate Buildings | CommunityServices | Planned |
Perform comprehensive climate audits on all civic facilities and prioritize upgrades where feasible and highest risk. |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | |||
Buildings | Policies | Leadership | Leadership | Corporate Buildings | Planning and Development | Planned |
Develop and implement a green buildings policy for the construction and renovation of City-owned facilities. |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | |||
Buildings | Policies | Buildings | New Buildings | Energy Step Code | Planning and Development | Completed |
Develop a strategy and adopt the BC Energy Step Code in advance of the provincial timeline. |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | |||
Buildings | Policies | Buildings | New Buildings | Other | Planning and Development | In Effect |
Revise the City’s Sustainability Report Card to include performance measures to reduce operational and embodied GHG emissions and climate risks. |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | |||
Buildings | Policies | Buildings | Existing Buildings | Other | Planning and Development | In Effect |
Revise the City’s Sustainability Report Card to include performance measures to reduce operational and embodied GHG emissions and climate risks. |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | |||
Buildings | Policies | Buildings | New Buildings | Other | Planning and Development | Planned |
Develop and implement a green buildings rezoning policy for development applications. |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | |||
Buildings | Policies | Buildings | Existing Buildings | Strategy, Plan or Targets | Planning and Development | Planned |
Develop a resilient, zero-emissions plan for all existing buildings that includes addressing indoor air quality, and climate risks where possible. |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | |||
Buildings | Policies | Buildings | New Buildings | Strategy, Plan or Targets | Planning and Development | Planned |
Develop a resilient, zero-emissions plan for all new buildings that includes addressing indoor air quality and climate risks where possible. |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | |||
Buildings | Policies | Buildings | New Buildings | Advocacy | Planning and Development | In Effect |
Initiate/continue discussions with federal and provincial governments to advocate for authority, financing tools, benchmarking, and other policies essential for achieving zero emissions buildings. |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | |||
Buildings | Policies | Buildings | Existing Buildings | Advocacy | Planning and Development | In Effect |
Initiate/continue discussions with federal and provincial governments to advocate for authority, financing tools, benchmarking, and other policies essential for achieving zero emissions buildings. |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | |||
Buildings | Policies | Buildings | New Buildings | Other | Planning andDevelopment | Planned |
Explore opportunities for partnerships and financing strategies to support residents and business owners to address climate action for buildings. |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | |||
Buildings | Policies | Buildings | Existing Buildings | Other | Planning andDevelopment | Planned |
Explore opportunities for partnerships and financing strategies to support residents and business owners to address climate action for buildings. |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | |||
Buildings | Projects | Renewable Energy | Renewable Energy | Community Renewable Energy | Planning andDevelopment | Planned |
Explore the feasibility of creating a renewable energy hub where the City could generate or partner with organizations to produce renewable energy, and use this energy to power buildings and equipment. |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | |||
Transportation and Mobility | Projects | Leadership | Leadership | Corporate Mobility | EngineeringandOperations | In Effect |
Conduct a utilization assessment of the City’s fleet and identify opportunities to increase efficiency and reduce GHG emissions. |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | |||
Transportation and Mobility | Projects | Transportation | Shift Beyond the Car | Strategy, Plan or Targets | EngineeringandOperations | In Effect |
Accelerate and fund implementation of the Master Transportation Plan projects to reduce GHG emissions by 2030, including accelerating alternative transportation goals, and initiatives focused on transit, transit-oriented development, and paths and trails. |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | |||
Transportation and Mobility | Projects | Transportation | Shift Beyond the Car | Strategy, Plan or Targets | Planning and Development | Planned |
Develop a community zero-emissions mobility strategy. |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | |||
Transportation and Mobility | Projects | Transportation | Electric Vehicles | Strategy, Plan or Targets | Planning and Development | Planned |
Develop a community zero-emissions mobility strategy. |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | |||
Transportation and Mobility | Policies | Leadership | Leadership | Corporate Mobility | EngineeringandOperations | Planned |
Identify and implement policies to support the highest and best use of City-owned parking and curb space. |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | |||
Transportation and Mobility | Policies | Transportation | Electric Vehicles | Ride Sharing and/or Ride Hailing | Planning and Development | Planned |
Develop business license requirements and regulations through street and traffic bylaws that support low-emission ride-hailing services and autonomous vehicles. |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | |||
Transportation and Mobility | Infrastructure | Transportation | Shift Beyond the Car | Demonstration Projects | EngineeringandOperations | Planned |
Consider creating pedestrian priority zones in key areas. |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | |||
Transportation and Mobility | Programs | Transportation | Shift Beyond the Car | Other | Planning and Development | Planned |
Work with Port Moody schools to engage in School Travel Planning. |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | |||
Transportation and Mobility | Policies | Transportation | Shift Beyond the Car | Advocacy | Engineering and Operations | Planned |
Advocate for significant policy changes that reduce emissions including the Province (Right-to-Charge legislation), Metro Vancouver (tolls, congestion charging, TDM), TransLink (zero emission fleet), ICBC (alternative insurance), car-sharing services and the Port of Vancouver. |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | |||
Transportation and Mobility | Policies | Transportation | Electric Vehicles | Advocacy | Engineering and Operations | Planned |
Advocate for significant policy changes that reduce emissions including the Province (Right-to-Charge legislation), Metro Vancouver (tolls, congestion charging, TDM), TransLink (zero emission fleet), ICBC (alternative insurance), car-sharing services and the Port of Vancouver. |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | |||
Transportation and Mobility | Policies | Transportation | Shift Beyond the Car | Training, Outreach and Engagement | EngineeringandOperations | Planned |
Create public education campaigns to increase awareness of zero-emission transportation, including active options and zero-emission vehicle options. |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | |||
Transportation and Mobility | Policies | Transportation | Electric Vehicles | Training, Outreach and Engagement | Engineering and Operations | Planned |
Create public education campaigns to increase awareness of zero-emission transportation, including active options and zero-emission vehicle options. |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | |||
Waste Reduction and Management | Policies | Leadership | Leadership | Corporate Waste | CommunityServices | Planned |
Develop a zero-waste strategy for City facilities and City events. |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | |||
Waste Reduction and Management | Policies | Waste | Waste | Strategy, Plan or Targets | Planning and Development | Planned |
Develop a community and commercial focused zero waste strategy. |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | |||
Waste Reduction and Management | Policies | Waste | Waste | Advocacy | EngineeringandOperations | In Effect |
Initiate/continue discussions with Metro Vancouver to advocate for initiatives and policies to reduce waste, increase capture of methane at landfills, and increase reporting and awareness on waste generation. |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | |||
Waste Reduction and Management | Policies | Waste | Waste | Training, Outreach and Engagement | Engineering and Operations | Planned |
Work with partner organizations on public education campaigns to increase awareness of waste reduction tools, programs and information. |
Climate Action Plan | Plan Doc | Connected | Port Moody (City) | |||
Port Moody Climate Ready Homes and Buildings Plan (CRHBP) | Plans and Targets | Buildings | Leadership | Strategy, Plan or Targets | None |
2023 CEA Climate and Energy Action Award Nominee – Born from Port Moody’s climate action plan, the CRHBP puts the City on a trajectory to achieve net-zero emissions buildings by 2050 by encouraging fuel switching, accelerating requirements for low-emission new construction, addressing embodied emissions, topping up incentives for retrofits, and implementing a zero-emissions building policy for civic facilities. |
Port Moody (City) | |||||||
Port Moody Low Carbon Resilient Climate Action Plan, Phase One Implementation Strategy, and Annual Report | Plans and Targets | Leadership | Leadership | Strategy, Plan or Targets | None |
2022 CEA Climate and Energy Action Award Nominee |
Port Moody (City) | |||||||
Port Moody Low Carbon Resilient Climate Action Plan and Phase One Implementation Strategy | Plans and Targets | Leadership | Leadership | Strategy, Plan or Targets | None |
2021 CEA Climate and Energy Action Award Nominee |
Port Moody (City) |
Plans
All Plans for Port Moody
Plan Name | Status | Most Recent | Plan Type | Plan Category | Plan Actions |
---|---|---|---|---|---|
Climate Action Plan
Notes
This is where some notes would go, to give more details about the plan. |
In Effect | 2020 | Overarching | Adaptation / Mitigation Corporate / Community | Port Moody (City) Connected Items |
Climate Ready Homes and Buildings Plan | In Effect | 2022 | Sectoral | Building Plans | Port Moody (City) Connected Items |
Climate Action Plan Implementation 2021 Annual Report – Phase One | None | 2021 | Overarching | Adaptation / Mitigation | Port Moody (City) Connected Items |
2020 Climate Action Plan Phase One Climate Action Implementation Strategy | None | 2020 | Overarching | Adaptation / Mitigation Corporate / Community | Port Moody (City) Connected Items |
Climate Action Plan Implementation – 2022 Annual Report – Phase One, Year Two | None | 2022 | Overarching | Mitigation Community | Port Moody (City) Connected Items |
https://www.portmoody.ca/en/recreation-parks-and-environment/resources/Documents/Climate%20Action/Climate_Action_Plan_Implementation_2023_Annual_Report_-Phase_Two_Year_One_.pdf | None | 2023 | Overarching | Mitigation Corporate / Community | Port Moody (City) Connected Items |