Squamish (District) Regional District: Squamish-Lillooet
Community Contact
37955 Second Avenue
Squamish, BC V8B 0A3
604-892-5217
admdept@squamish.ca
Community Info
Economic Region : Mainland/Southwest
Regional District: Squamish-Lillooet
Area Association: LMLGA
Climate Zone : Zone 5
Utilities Data
Gas Provider: Fortis
Electricity Provider: BC Hydro
Electrical Reliability Performance Data
2020 | 2021 | 2022 | |
---|---|---|---|
Average customer interruption (hours) | 4.35 | 9.44 | 2.91 |
Average number of interruptions per customer: | 1.68 | 2.48 | 3.46 |
Available LGCAP Reports
Building Codes and other Regulations
Action Name | Type | Sector | Big Move | Category | Department | Commitment | Yr Planned | Yr Actual | Link | Description | Connected to Plan(s) | Plan Doc | Plan Actions | Community | Verified? |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
EV-Ready Building Requirements | Regulation | Transportation | Electric Vehicles | EV-Ready Building Requirements | In Effect | January 1, 2018 | View Action Doc |
Zoning bylaw 2200, 2011, has been amended to require: 10% of the required off-street parking spaces in new commercial or industrial developments shall be provided with access to an energized outlet capable of providing level 2 charge that can deliver a minimum of 3.3kW of power. |
Squamish (District) | ||||||
Part 9 New Construction | Regulation | Buildings | New Buildings | Building Codes | In Effect | July 2, 2024 | View Action Doc |
Single family and duplex: Zero-Carbon Zero (EL-4) + Energy Step 4 Multi-family: Zero-Carbon Zero (EL-4) + Energy Step 3 (BCBC) |
Squamish (District) | ||||||
Part 3 New Construction | Regulation | Buildings | New Buildings | Building Codes | Expired | View Action Doc |
Residential/mixed use: Commercial: Energy Step 3, or: |
Squamish (District) | |||||||
Part 3 New Construction | Regulation | Buildings | New Buildings | Building Codes | In Effect | July 2, 2024 | View Action Doc |
Commercial: Zero-Carbon Zero (EL-4) + Energy Step 2 (BCBC) Residential: Zero-Carbon Zero (EL-4)+ Energy Step 3 |
Squamish (District) |
Actions
Action Name | Type | Sector | Big Move | Category | Department | Commitment | Yr Planned | Yr Actual | Description | Connected to Plan(s) | Plan Doc | Plan Actions | Community | Verified? |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Retrofit Assist | Programs | Buildings | Existing Buildings | Retrofit Program | None |
2022 CEA Climate and Energy Action Award Nominee |
Squamish (District) | |||||||
A Local Government Guide: Policies, Programs and Incentives to Reduce Embodied Emissions in the Built Environment | Policies | Buildings | Leadership | Other | None |
2023 CEA Climate and Energy Action Award Nominee – Collaboration involving Whistler, Squamish, and the Squamish Nation led to the creation of this guide to embodied emissions that organizes potential actions within a hierarchy that encourages actions with the greatest emissions reductions. Within the guide, each action has an impact rating, and “quick wins” are highlighted in each category. |
Squamish (District) |
Plans
All Plans for Squamish
Plan Name | Status | Most Recent | Plan Type | Plan Category | Plan Actions |
---|---|---|---|---|---|
Community Climate Action Plan | In Effect | 2020 | Overarching | Mitigation Corporate / Community | Squamish (District) Connected Items |